Descriptions

Product

Descriptions
Product

FIRE DIFFUSION PREVENTION STRUCTURE

Sandwich panel fire accident

I can prevent it now.

Introducing ON-SITE charging construction technology 


ON-SITE construction technology is a method of charging with a blower after drilling a hole in the construction area.

Construction is possible without empty space inside, and in the event of a fire using semi-non-combustible materials.

It shows safer performance than sandwich panel construction.



We work on the remodeling by ripping off the materials.

There are many parts that are difficult to remove because the irregularities are intertwined or the attachment surfaces are different.

However, when using ON-SITE technology, it is easy to construct because it charges with Blower through gaps or holes.

Existing Fire Diffusion Prevention Structure 

[Construction procedure]

1. Installation of a safety railing, a temporary footboard

2. Steel plate cutting at construction site

3. Remove combustible EPS (Styrofoam)

4. Construction of flame-retardant insulation

5. Reattachment of Steel Plate

6. Finishing construction

 Construction cost 

KRW 1,000,000/m 

 Time required 

30 ~ 45 day 

HTM ON-SITE Construction

[Construction procedure ]

1. Construction area 400mm apart 48 ø perforation

2. Dedicated Special Solvent Dispensing → Combustible EPS Removal 

3. Cera foam 2 semi-non-combustible insulation injection construction

4.  Perforated area cap finish

 Construction cost  

KRW 250,000/m 

 Time required   

3 ~ 5 day

FIRE DIFFUSION

PREVENTION STRUCTURE

Sandwich panel fire accident

I can prevent it now.

 Introducing ON-SITE charging construction technology


ON-SITE construction technology is a method of charging with a blower after drilling a hole in the construction area.

Construction is possible without empty space inside, and in the event of a fire using semi-non-combustible materials.

It shows safer performance than sandwich panel construction.





We work on the remodeling by ripping off the materials.

There are many parts that are difficult to remove because the irregularities are intertwined or the attachment surfaces are different.

However, when using ON-SITE technology, it is easy to construct because it charges with Blower through gaps or holes.

Existing Fire Diffusion Prevention Structure

HTM ON-SITE Construction

[Construction procedure]

1. Installation of a safety railing, a temporary footboard 
2. Steel plate cutting at construction site
3. Remove combustible EPS (Styrofoam)
4. Construction of flame-retardant insulation
5. Reattachment of Steel Plate 
6. Finishing construction 

[Construction procedure ]

1. Construction area 400mm apart 48 ø perforation 
2. Dedicated Special Solvent Dispensing → Combustible EPS Removal 
3. Cera foam 2 semi-non-combustible insulation injection construction 
4.  Perforated area cap finish 

Construction cost 

KRW 1,000,000/m

Construction cost 

KRW 250,000/m

Time required

30 ~ 45 day

Time required 

3 ~ 5 day

Patent Registration 

ON-SITE charging construction

It is an experimental and patent-registered technology.



HTM Korea Co., Ltd.

TEL

Representative Director : Namjin Cho

Business Registration No. : 746-81-02383

Address (HQ) : B1, Bldg. D, 284, Namdongdaero,

Namdong-gu, Incheon, Gyeonggi-do, Republic of Korea

Youtube↗

Store↗ 

Blog↗ 

@Copyright 2024. HTMKorea. All rights reserved.